Common Criteria Adopted For Selecting the Dispute Resolution Method in Construction Projects of Pakistan

Authors

  • Faraz Asad QUAID-E-AWAM UNIVERSITY OF ENGINEERING, SCIENCE & TECHNOLOGY NAWABSHAH, SINDH, PAKISTAN
  • Abdul Qadir Memon
  • Fahad Ahmed Shaikh

Abstract

Objective:This study assessed various criteria affecting the selection of dispute resolution methods adopted in the construction industry of Pakistan

Research Method:This was assessed based on the perception of the construction practitioners. Data was collected with the help of the questionnaire forms. Total 52 responses from the practitioners were collected and analyzed statistically.

Findings:The findings of the study showed that cost is the most commonly adopted criterions for selecting the dispute resolution method while degree of formality is the least adopted criterion.

Originality:This study will help the practitioners for selecting the appropriate dispute resolution technique in the construction projects